CM 512 Problems in Heavy Construction
The general superintendent, engineering staff and construction manager, in order to manage, schedule and complete the heavy construction project, must be aware of problems associated with the completion of the complex project. Problems associated with pile driving & shoring, excavation methods, tunneling, trenchless technology, and rock excavation are reviewed. Examples and case studies are discussed with alternate solutions reviewed based on site conditions and economic considerations.
Prerequisite
Graduate Student or At Least Junior
Distribution
Construction Management Program